Modernization and expansion of 7 regional airports

Modernization and expansion of 7 regional airports
Location Islands of Rhodes, Kos, Santorini, Mykonos, Samos, Skiathos and Mytilene, Greece
Project Duration 2016-2017
Industry Infrastructure Transportation
Client Fraport Regional Airports of Greece

Rehabilitation, modernization, and expansion for the airports on the islands of Rhodes, Kos, Santorini, Mykonos, Samos, Mytilene and Skiathos, in the Aegean Sea

Fraport Regional Airports of Greece was established for the 40-year concession for the upgrade, maintenance, management and operation of 14 regional airports in Greece. The concession entails designing, developing, engineering, procuring, constructing, commissioning, maintaining, operating, managing, owning and financing the airports over the 40 years. As a first step, the concessionaire is required to undertake certain Imminent Refurbishment and Expansion Works under ongoing operation. The aforementioned works refer to the following four parts of the airports:

Passenger terminal buildings

  • Airside – infrastructure, related to the operation of aircrafts, including runways, taxiways and aprons
  • Landside – roads and parking areas in the airports plot
  • Sitewide and ancillary buildings – all other buildings, installations and infrastructure within airport boundaries (fire stations, gatehouses, substations etc.)
  • OBERMEYER’s assignment embraces the provision of engineering services for all the above and in all project phases until a Works Contract for the said works is in place for the airports on the islands of Rhodes, Kos, Santorini, Mykonos, Samos, Skiathos and Mytilene at the Aegean Sea:

  • Terminal buildings: refurbishment and reconfiguration of existing buildings, total GFA approx. 85,000 m² and new buildings / expansions, total GFA 45,000 m²
  • Rescue & Firefighting (RFF) buildings: new at all airports, GFA 1,140 – 1,430 sq.m. per airport
  • Apron / airside pavement extensions of a total 17,000 m²
  • Runway repairs 4,500 m²
  • Landside reconfiguration (road access and parking for passenger/rental/employee cars, taxis and buses) at all airports
  • Wastewater treatment plants: 2 new plants and refurbishment of one existing
  • Services Provided

    The scope of services includes three main stages: evaluation of existing facilities at all 7 airports, design of rehabilitation, modernization, expansion, and new construction for the entire airport facilities and elaboration of the tender documents for the implementation of the designs.

    Technical Specifications

    Total Gross Floor Area of refurbished existing airport buildings 85.000 m2
    Total Gross Floor Area of newly built airport buildings: 45.000 m2
    Total apron / airside pavement extensions 17.000 m2
    Total Runway repairs 4.500 m2